SIP&T casings at work in Switzerland for a large infrastructural project based on the execution of inclined boreholes diameter 700 mm – 15/24 m depth
The project in Horw is the foundation work for the construction of four big buildings that will mainly include apartments and it is expected to be completed in august 2020. A collection of unique residences individually designed to meet the needs of each resident embracing the best in Vierwaldstättersee architecture, art and culture. Project is based on Read more